Statnett Completed in October – November 2018. Drilling and blasting work for deep shaft into the transformer station. 37m2 cross section, 20 metres down into existing cavern. Subject to strict requirements for implementation.
E16 Implenia – Isachsen ANS Completed in 2016 – 2019. New stretch of E16 with ramps and side roads. Creeks, water and sewage. Stitch drilling and blasting of cut/road.
John Fadum, Carl C Fon, Tønsberg Municipality + + We currently have two Atlas Copco T15 mobile drill rigs with blaster that are only used for smaller assignments.