Kjeldaas AS
Completed in 2018 – 2019. Two pools for the deposition of sediments. Depth of up to 26 metres. Blasting with consideration to railway.
Kjeldaas AS
Completed in 2018 – 2019. Two pools for the deposition of sediments. Depth of up to 26 metres. Blasting with consideration to railway.